The Korea Sports Promotion Foundation held a completion ceremony for soccer-only smart air domes in Cheongun-dong, Gyeongju on the 30th.

It is the first time in Korea that a smart air dome for soccer has been installed.

A total of 300 people, including Chairman Cho Hyun-jae and the 2nd Vice Minister of Culture, Sports and Tourism Cho Yong-man, attended the completion ceremony of the ‘Smart Air Dome’ held on this day.

The ‘Smart Air Dome’ completed this time was carried out as a public contest by local governments as a ‘Battery Training Specialized Facility (Air Dome) Installation Support Project’ promoted by the Ministry of Culture, Sports and Tourism and the Corporation in 2020. Gyeongju City was selected as the first project site, and the construction started in December of `21 and went through a construction period of about a year 스포츠토토. The total project cost is 10.7 billion won including 5 billion won from the National Sports Promotion Fund (1 billion won for provincial expenses and 4.7 billion won for municipal expenses).

The ‘Smart Air Dome’ was built as the largest air dome in Korea with a total area of ​​about 25,000㎡ (air dome 10,000㎡). The air dome is a facility that can be used regardless of the season and the external environment such as fine dust, as the fiber roof is maintained by air pressure and an automatic air purification and cooling/heating system is installed.

In particular, the ‘Smart Air Dome’ can be maintained for more than 4 hours even if the inflow of air is blocked, and it is evaluated as a safe facility by introducing an automatic control system that automatically operates the blower and lighting equipment in case of an emergency.

Chairman Cho Hyun-jae said, “Congratulations on the completion of the Smart Air Dome installed in Gyeongju for the first time in Korea, and we expect many soccer players to conduct comfortable training regardless of the season.” We will do our best to make it possible.”

Meanwhile, ‘Smart Air Dome’ will be officially opened in April after a two-month pilot operation period after the completion ceremony, and will be installed in Changwon, Gyeongnam, Chuncheon, and Goseong, Gangwon.

Leave a Reply

Your email address will not be published. Required fields are marked *